2022, Vol. 59(6): 106-113 DOI: | ||
Test Verification of Synchronous Technology Combining Shield Tunnelling with Segment Assembling Based on the Principle of Maximum Pressure Redundancy | ||
(1. Shanghai Tunnel Engineering Co., Ltd., Shanghai 200232; 2. Shanghai Urban Construction Tunnel Equipment Co., Ltd.,Shanghai 200137) | ||