现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2022, Vol. 59(6): 216-223    DOI:
Research on Zonal Dust Removal Technology in Tunnel Construction Period Based on Fuzzy Control
(1. School of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074; 2. China Merchants Chongqing Communications Technology Research & Design Institute Co., Ltd., Chongqing 400067)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn