|
2023, Vol. 60(1): 11-22 DOI: | ||
Present Status and Prospect of the Study on Key Technologies of Tunnel Ahead and Station (Shaft) Following Method | ||
(1. College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058; 2. Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015; 3. Key Laboratory of Safe Construction and Intelligent Maintenance for Urban Shield Tunnels of Zhejiang Province, Hangzhou 310015) | ||
Received null Revised null | ||
Supporting info | ||
|