现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2023, Vol. 60(1): 66-75    DOI:
Design and Development of the Shield Construction Assistant Decision-making System Based on the Knowledge Graph
(1. SILC Business School, Shanghai University, Shanghai 201800; 2. SHU-SUCG Research Center of Building Industrialization,Shanghai University, Shanghai 200072; 3. Shanghai Tunnel Engineering Co., Ltd., Shanghai 200232)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn