现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2023, Vol. 60(2): 168-177    DOI:
A Study on Disturbance Pattern of Asymmetric Synchronous Grouting on Ground during Large Diameter Shield Tunnelling
(1. China Construction Fourth Engineering Division Corp., Ltd., Guangzhou 510610; 2. CSCEC4 Civil Engineering Co., Ltd., Shenzhen 518101; 3. School of Civil Engineering, Guangzhou University, Guangzhou 510006)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn