现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2023, Vol. 60(2): 194-202    DOI:
A Study on Control Size of Blast Muck for Vertical Shaft Construction Using the Raise-boring Method
(1. School of Highway, Chang′an University, Xi′an 710064; 2. CCCC First Highway Consulting Co., Ltd., Xi′an 710068)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn