|
2023, Vol. 60(3): 90-101 DOI: | ||
Study on the Impact of Different Construction Timings of Internal Structure on the Stress of Segmental Lining of the Shield Tunnel with an Super-large Section | ||
(1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031;2. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063) | ||
Received null Revised null | ||
Supporting info | ||
|