|
2023, Vol. 60(4): 14-22 DOI: | ||
Calculation Method for Safe Thickness of Water Insulation Rock in Tunnelling Based on Timoshenko Beam Theory | ||
(1. National Engineering Research Center of High-speed Railway Construction Technology, Central South University,Changsha 410075; 2. China Railway Group Limited, Beijing 100039; 3. School of Civil Engineering, Central South University,Changsha 410075; 4. No.4 Engineering Co., Ltd. of China Railway 17th Bureau Group Co., Ltd., Chongqing 401121) | ||
Received null Revised null | ||
Supporting info | ||
|