|
2023, Vol. 60(4): 196-203 DOI: | ||
Study on Cross Section Optimization in Plateau Railway Tunnels Constructed by Drill and Blast Method | ||
(1. China Railway Economic and Planning Research Institute, Beijing 100038; 2. China Railway Eryuan Engineering Group Co., Ltd.,Chengdu 610031; 3. Southwest Jiaotong University, Chengdu 610031; 4. China Railway Southwest Research Institute Co., Ltd.,Chengdu 611731) | ||
Received null Revised null | ||
Supporting info | ||
|