|
2023, Vol. 60(4): 204-212 DOI: | ||
Construction Design for Super-large Section Tunnels in Fault Zone with High Geotress | ||
(1. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031; 2. China Railway 19th Bureau Group Coporation limited,Beijing 100176) | ||
Received null Revised null | ||
Supporting info | ||
|