|
2023, Vol. 60(4): 254-263 DOI: | ||
Experimental Study on Prevention and Treatment of Tunnel Leakage with Rapid Setting Permeable Crystallographic Grouts | ||
(1. China State Construction Silk Road Construction Investment Co., Ltd., Xi′an 710065; 2. School of Human Settlements and Civil Engineering of Xi′an Jiaotong University, Xi′an 710049; 3. School of Highway, Chang′an University, Xi′an 710064) | ||
Received null Revised null | ||
Supporting info | ||
|