|
2023, Vol. 60(5): 136-147 DOI: | ||
Research on Failure Mechanism of Tunnel with Articulated Lining Crossing Strike-slip Fault | ||
(1. CCCC Second Highway Consultants Co., Ltd., Wuhan 430056; 2. Research and Development Center on Tunnel and Underground Space Technology, CCCC, Wuhan 430056;3. State Key Laboratory of Geotechnical Mechanics and Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071; 4. Nanchang Water Resources Bureau, Nanchang 330000) | ||
Received null Revised null | ||
Supporting info | ||
|