|
2023, Vol. 60(5): 213-223 DOI: | ||
Instability of Large Diameter Slurry Shield Tunnelling Attitude in Highly Viscous Clay Strata and Treatment Measures | ||
(1. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450000; 2. School of Civil Engineering, Central South University,Changsha 410075; 3. China Railway Development and Investment Group Co., Ltd., Kunming 650200) | ||
Received null Revised null | ||
Supporting info | ||
|