现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2023, Vol. 60(5): 269-276    DOI:
Experimental Study on the Preparation of Non-fired Building Materials by Recycling Shield Muck in Silty Clay Stratum
(1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031;2. Jiangsu Transportation Engineering Construction Bureau, Nanjing 210000; 3. China Design Group Co., Ltd., Nanjing 210005;4. China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd., Jinan 250014)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn