|
2024, Vol. 61(1): 156-164 DOI: | ||
Study on Integrated Multi-objective Optimization of TBM Construction Method Based on the Improved Lightning Search Algorithm | ||
(1. Zhejiang Jinyun Pumped Storage Co., Ltd., Lishui 321400; 2. Huadong Engineering Corporation Limited, Hangzhou 310000) | ||
Received null Revised null | ||
Supporting info | ||
|