|
2024, Vol. 61(1): 190-199 DOI: | ||
Test and Analysis of the Effect of the Freezing Construction of Subway Cross Passage on Adjacent Shield Tunnel Segment | ||
(1. School of Civil Engineering and Architecture, East China Jiaotong University, Nanchang 330013; 2. East China Jiaotong University Jiangxi Architectural Design Institute Co., Ltd., Nanchang 330013; 3. School of Civil Engineering, Central South University,Changsha 410075; 4. Nanchang Rail Transit Group Limited Corporation, Nanchang 330038;5. China Railway Nanchang Group Co., Ltd., Nanchang 330009) | ||
Received null Revised null | ||
Supporting info | ||
|