现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2024, Vol. 61(1): 208-215    DOI:
Study on Field Test of Joint Waterproofing of Long-segment Heavy-tonnage Prefabricated Assembled Utility Tunnel
(1. CCCC-SHEC Six Engineering Co., Ltd., Xi'an 710075; 2. CCCC Highway Bridges National Engineering Research Centre Co., Ltd.,Beijing 100120; 3. Shanghai Municipal Engineering Design Institute (Group) Co., Ltd., Shanghai 200092; 4. CCCC-SHEC Engineering Design and Research Institute, Xi'an 710065; 5. Hebei Academy of Building Research Co., Ltd., Shijiazhuang 050021;6. School of Civil Engineering, North China University of Technology, Beijing 100144)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn