现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2024, Vol. 61(1): 216-228    DOI:
Study on Interaction Mechanism and Key Parameters of Shield Cutter Cutting the Pile Foundation—Case Study of Haizhu Bay Shield Tunnel Project
(China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd., Nanjing 211800)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn