|
| 2024, Vol. 61(1): 216-228 DOI: | ||
| Study on Interaction Mechanism and Key Parameters of Shield Cutter Cutting the Pile Foundation—Case Study of Haizhu Bay Shield Tunnel Project | ||
| (China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd., Nanjing 211800) | ||
| Received null Revised null | ||
| Supporting info | ||
|