2024, Vol. 61(2): 124-138 DOI: | ||
Progress and Prospects of Construction Technology for Ultra-Large Diameter Underwater Shield Tunnels | ||
(1. China Railway 14 Burean Group Co.,Ltd, Jinan 250101; 2. CRCC Underwater Tunnel Engineering Laboratory, Jinan 250101;3. Shandong Engineering Research Center for Intelligent Construction and Equipment Remanufacturing of Large Shield Tunnels,Jinan 250101; 4.College of Environmental Science and Engineering, Ocean University of China, Qingdao 266100;5. School of civil engineering , Beijing jiaotong university, Beijng 100044) | ||
Received null Revised null | ||
Supporting info | ||
|