|
2024, Vol. 61(2): 263-271 DOI: | ||
Research and Application of Full-Face Pipe Jacking Method in Saturated Soft Soil Layers for the Jing′an Temple Station Subway Project | ||
(1. Shanghai Tunnel Engineering Co., Ltd., Shanghai 200032; 2. Shanghai Traffic Construction Engineering Safety and Quality Supervision Station, Shanghai 200120) | ||
Received null Revised null | ||
Supporting info | ||
|