|
2024, Vol. 61(3): 253-265 DOI: | ||
Study on Mechanism and Prevention of Slope Instability at Shallow-buried, Bedding and Unsymmetrically Loaded Tunnel Portal | ||
(Sichuan Highway Planning, Survey, Design and Research Institute Co., Ltd., Chengdu 610041) | ||
Received null Revised null | ||
Supporting info | ||
|