现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2024, Vol. 61(4): 112-118    DOI:
Study on Mechanical Model for Longitudinal Deformation of Existing Shield Tunnel Caused by New Tunnel Over-crossing Construction
(1. Henan Rail Transit Research Institute Co., Ltd., Zhengzhou 450000;2. Henan Kaifeng Intercity Railway Investment Co., Ltd.,Kaifeng 475000;3. Henan RClC New Infrastructure Co., Ltd., Zhengzhou 450000;4. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn