|
2024, Vol. 61(4): 119-125 DOI: | ||
Technical and Economic Comparative Study of TBM Belt Conveyor Mucking | ||
(1. China Railway 18th Bureau Group Co., Ltd., Tianjin 300222; 2. School of Civil Engineering, Southwest Jiaotong University,Chengdu 610031; 3. School of Civil Engineering, Dalian University of Technology, Dalian 116024;4. National Engineering Laboratory for Highway Maintenance Equipment, Chang'an University, Xi'an 710061) | ||
Received null Revised null | ||
Supporting info | ||
|