|
2024, Vol. 61(4): 142-150 DOI: | ||
Mechanical Behavior Analysis and Construction Optimization for Inclined Shaft Transitioning to Main Tunnel in Extreme-highly Stressed and Fractured Strata | ||
(1. China Railway Tunnel Group Co., Ltd., Guangzhou 511458; 2. Guangdong Key Laboratory of Intelligent Monitoring and Maintenance of Tunnel Structure, Guangzhou 511458) | ||
Received null Revised null | ||
Supporting info | ||
|