|
2024, Vol. 61(4): 244-254 DOI: | ||
Construction Challenges and Key Construction Technologies for Large-diameter River-crossing Shield Tunnels in Complex Strata: A Case Study of the Running Tunnel Section between Guobo Center South Station and Lingwu Village Station of the Wuhan Metro Line 12 | ||
(1. School of Civil Engineering, Central South University, Changsha 410075; 2. China Railway Development and Investment Group Co.,Ltd., Kunming 650200; 3.China Railway Tunnel Stock Co., Ltd., Zhengzhou 450000) | ||
Received null Revised null | ||
Supporting info | ||
|