|
2024, Vol. 61(5): 42-51 DOI: | ||
Theoretical Calculation Model for Stability of Tunnel Excavation Face with Pre-grouting Reinforcement | ||
(1. School of Civil Engineering,Southwest Jiaotong University, Chengdu 610031; 2. State Key Laboratory of Intelligent Geotechnics and Tunnelling, Chengdu 610031; 3. Key Laboratory of Transportation Tunnel Engineering,Ministry of Education,Southwest Jiaotong University, Chengdu 610031; 4. Sichuan Vocational and Technical College of Communications, Chengdu 611130; 5. The 3rd Engineering Co, Ltd. of China Railway Construction Bridge Engineering Bureau Group, Shenyang 110043) | ||
Received null Revised null | ||
Supporting info | ||
|