|
2024, Vol. 61(5): 71-78 DOI: | ||
Settlement Analysis of Existing Prefabricated Subway Stations Induced by Overburden Backfill Load Based on Kerr Foundation Model | ||
(1. China Railway 14th Bureau Group Co., Ltd, Jinan 250000; 2. School of Aeronautics and Astronautics,Sun Yat-sen University,Shenzhen 518107; 3. School of Civil Engineering, Sun Yat-sen University, Zhuhai 519082; 4. Southern Marine Science and Engineering Guangdong Laboratory (Zhuhai), Zhuhai 519082) | ||
Received null Revised null | ||
Supporting info | ||
|