现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2024, Vol. 61(5): 71-78    DOI:
Settlement Analysis of Existing Prefabricated Subway Stations Induced by Overburden Backfill Load Based on Kerr Foundation Model
(1. China Railway 14th Bureau Group Co., Ltd, Jinan 250000; 2. School of Aeronautics and Astronautics,Sun Yat-sen University,Shenzhen 518107; 3. School of Civil Engineering, Sun Yat-sen University, Zhuhai 519082; 4. Southern Marine Science and Engineering Guangdong Laboratory (Zhuhai), Zhuhai 519082)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn