|
2024, Vol. 61(5): 263-273 DOI: | ||
Research on Treatment Technology for Arch Bridge-tunnel Integrated Structure Spanning a Large Karst Cave Section | ||
(1. China Railway NO.4 Civil Engineering Group Co., Ltd., Hefei 230023;2 .Key Laboratory of Transportation Tunnel Engineering,Ministry of Education, Southwest Jiaotong University, Chengdu 610031;3. Shaanxi Engineering Laboratory of High Performance Concrete Shaanxi Railway Institute, Weinan 714000) | ||
Received null Revised null | ||
Supporting info | ||
|