|
2024, Vol. 61(5): 274-284 DOI: | ||
Study on the Disturbance Patterns of Roadheader Construction of Large-section Railway Tunnel Under-crossing Existing Buildings in Karst Stratum | ||
(1. Department of Geotechnical Engineering College of Civil Engineering, Tongji University, Shanghai 200092;2. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092;3. Kunming Survey, Design and Research Institute Co. Ltd. of CREEC, Kunming 650200) | ||
Received null Revised null | ||
Supporting info | ||
|