现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2024, Vol. 61(6): 269-277    DOI:
Construction Methods of Longitudinal Synchronous Grouting for Tunnel Crown Secondary Lining Voids
(1. China Railway 18th Bureau Group Co. Ltd., Tianjin 300222; 2. College of Transportation Engineering, Nanjing Tech University, Nanjing 211816; 3. The Second Engineering Co., LTD., China Railway 18th Bureau Group, Tangshan 063000;4. Civil Engineering and Architecture ,Southwest University of Science and Technology Civil ,Mianyang 621010)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn