|
2025, Vol. 62(2): 121-131 DOI: | ||
Interval Prediction of TBM Parameters in Stable Excavation Sections Based on Bootstrap-COA-BiGRU Model | ||
(1.Key Laboratory of Urban Disaster Prevention and Mitigation of Ministry of Education, Beijing University of Technology,Beijing 100124; 2.Xinjiang Water Conservancy Development Investment(Group) Co.,Ltd., Urumqi 830000) | ||
Received null Revised null | ||
Supporting info | ||
|