|
2025, Vol. 62(2): 172-182 DOI: | ||
Influence of Shield Cutter Layered Configuration and Cutting Parameters on the Fracture Mechanism of Hollow Pipe Piles | ||
(1. Ningbo Service Chief Station of Construction Safety & Quality, Ningbo 315040; 2. Construction branch of Ningbo Rail Transit Group Co. Ltd, Ningbo 315101; 3. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044; 4. CCCC Tunnel Engineering Company Limited, Beijing 100088) | ||
Received null Revised null | ||
Supporting info | ||
|