|
2025, Vol. 62(2): 265-273 DOI: | ||
Study and Application of Dual-component Synchronous Grouting Technology in Shield Tunnelling | ||
(1.CCCC First Highway Engineering Co., Ltd., Beijing 100024; 2.CCCC Tunnel Engineering Co, Ltd., Nanjing 211100) | ||
Received null Revised null | ||
Supporting info | ||
|