|
2025, Vol. 62(3): 60-66 DOI: | ||
Tunnel Energy Supply Strategy and Practice with Grid-Connected PV-Storage Microgrid: A Case Study of the Wudingguan Tunnel Photovoltaic Power Station Project | ||
(1.Hanzhong Highway Bureau, Hanzhong 723012; 2. Shaanxi Provincial Key Laboratory of Highway Bridges and Tunnels, Xi′an 710064; 3. Xi′an Chang′an University Engineering Design and Research Institute Co., Ltd., Xi′an 710064) | ||
Received null Revised null | ||
Supporting info | ||
|