|
2025, Vol. 62(3): 75-87 DOI: | ||
Study on Surrounding Rock Identification and Excavation Speed Prediction in TBM Tunnels Based on the Interaction Mechanism of Rock-Machine Parameters | ||
(1. Sinohydro Bureau 14 Co. Ltd., Kunming 650041; 2. School of Engineering and Technology, China University of Geosciences(Beijing), Beijing 100083; 3. Institute of Geotechnical and Underground Engineering, Shandong University, Jinan 250061) | ||
Received null Revised null | ||
Supporting info | ||
|