|
2025, Vol. 62(3): 100-107 DOI: | ||
Optimization of Construction Parameters for Shield Tunnels Undercrossing Existing Lines Based on Numerical Simulation and Machine Learning | ||
(1.School of Civil Engineering, Central South University, Changsha 410075; 2.College of Civil and Transportation Engineering,Shenzhen University, Shenzhen 518060) | ||
Received null Revised null | ||
Supporting info | ||
|