|
2025, Vol. 62(3): 217-228 DOI: | ||
Adaptive Strategies for Mechanized Drill-and-Blast Construction in Highway Tunnels | ||
(1. Southwest Jiaotong University, Chengdu 610031; 2.Sichuan Highway Planning, Survey, Design and Research Institute Co., Ltd.,Chengdu 610041) | ||
Received null Revised null | ||
Supporting info | ||
|