|
2025, Vol. 62(4): 145-154 DOI: | ||
Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses | ||
(1. School of Civil Engineering, Central South University, Changsha 410075; 2. China Railway 18th Bureau Group Co.,Ltd., Tianjin 300222; 3. China Railway No.18 Bureau Group Tunnel Engineering Co., Ltd., Chongqing, 400700; 4. School of Qilu Transportation,Shandong University, Jinan 250061; 5. School of Materials Science and Engineering, Nanjing Tech University, Nanjing 211816; 6. China Railway Southwest Research Institude Co. Ltd., Chengdu 611731) | ||
Received null Revised null | ||
Supporting info | ||
|