现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2025, Vol. 62(4): 273-282    DOI:
Research on Optimization of Construction Methods for Ultra-large Cross-section Tunnels: A Case Study of the Lihuashan Tunnel on the Tianfu New Area-Qionglai Expressway
(1. Pavement Engineering Branch of Sichuan Communications Construction Group Co., Ltd., Chengdu 610047; 2. School of Architecture and Civil Engineering, Xihua University, Chengdu 610039; 3. Sichuan Tibetan Area Expressway Co., Ltd., Chengdu 610047; 4. Sichuan Communications Construction Group Co., Ltd., Chengdu 610047; 5. Sichuan Dujin Mountain Rail Transit Co., Ltd., Wenchuan 623006; 6. Sichuan Provincial Transport Department Highway Planning, Survey, Design and Research Institute,Chengdu 610041)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn