|
| 2025, Vol. 62(5): 36- DOI: | ||
| Calculation Method for the Ultimate Face Support Pressure of Shield Tunnels in Highly Permeable Sandy Soils | ||
| (1. Nanchang Rail Transit Group Co., Ltd, Nanchang 330200; 2. China Construction Third Group Co., Ltd., Wuhan 430075; 3. School of Civil Engineering, Central South University, Changsha 410075) |
||
| Received null Revised null | ||
| Supporting info | ||
|