现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2025, Vol. 62(5): 97-    DOI:
Multi-objective Intelligent Optimization Framework for Construction Procedures of Large Cross-section Karst Tunnels Excavated Beneath Airports Using Roadheaders
(1. Key Laboratory of Geotechnical and Underground Engineering of Education Ministry, Tongji University, Shanghai 200092;
2. Department of Geotechnical Engineering College of Civil Engineering, Tongji University, Shanghai 200092;
3. China Railway Second Institute Kunming Survey and Design Research Institute Co., Ltd., Kunming 650200;
4. China Railway Kunming Group Co., Ltd., Kunming 650011)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn