现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2025, Vol. 62(5): 116-    DOI:
BM Advance Rate Advance and Interpretability Analysis Using the #br# NRBO-XGBoost Method
(1. School of Civil Engineering and Architecture, Anhui University of Science and Technology, Huainan 232001;
2. State Key Laboratory for Safe Mining of Deep Coal Resources and Environment Protection, Anhui University of Science and
Technology, Huainan 232001; 3. Vanadium and Titanium Institute of Panzhihua University, Panzhihua 617000;
4. Huainan Mining (Group) Co., Ltd., Huainan 232001)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn