|
2011, Vol. 48(2): 44-48 DOI: | ||
Research on Construction Dynamic Control and Optimization of a Tunnel in Soft Rock under High In-situ Stresses | ||
(China Railway No.11 Construction Bureau Group Co., Ltd., Wuhan 430074) | ||
Received null Revised null | ||
Supporting info | ||
|