|
2011, Vol. 48(4): 122-125 DOI: | ||
Construction of the Intersection Joint of the Xishan Super-long Tunnel with Inclined Shaft | ||
(First Engineering Company, China Railway First Engineering Bureau Group Co.,Ltd.,Weinan 714000) | ||
Received null Revised null | ||
Supporting info | ||
|