现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2011, Vol. 48(4): 122-125    DOI:
Construction of the Intersection Joint of the Xishan Super-long Tunnel with Inclined Shaft
(First Engineering Company, China Railway First Engineering Bureau Group Co.,Ltd.,Weinan  714000)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn