|
2011, Vol. 48(4): 131-134 DOI: | ||
Construction Techniques for Inverts of Steeply Inclined Shafts with High Water Inflow | ||
(The 3rd Engineering Company, China Railway 12th Engineering Bureau Group, Taiyuan 030024) | ||
Received null Revised null | ||
Supporting info | ||
|