现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2011, Vol. 48(5): 63-69    DOI:
Numerical Simulation of the Construction Process of a Slurry Balance Shield Traversing Under an Existing Tunnel
(1 Shanghai Institute of Applied Mathematics and Mechanics, Shanghai 200072; 2 Department of Mechanics, Shanghai University, Shanghai 200444; 3 Shanghai Tunnel Engineering Construction Co. Ltd, Shanghai 200023)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn