|
2011, Vol. 48(5): 63-69 DOI: | ||
Numerical Simulation of the Construction Process of a Slurry Balance Shield Traversing Under an Existing Tunnel | ||
(1 Shanghai Institute of Applied Mathematics and Mechanics, Shanghai 200072; 2 Department of Mechanics, Shanghai University, Shanghai 200444; 3 Shanghai Tunnel Engineering Construction Co. Ltd, Shanghai 200023) | ||
Received null Revised null | ||
Supporting info | ||
|