现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2011, Vol. 48(5): 139-142    DOI:
Control Blasting of a Tunnel Group with a Small Clear Distance
(The Fourth Engineering Company of China Railway No.11 Construction Group, Wuhan 430074)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn