现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2011, Vol. 48(6): 150-154    DOI:
Alternated Construction Technique Applied to a Shield-Driven Tunnel in a Water-Abundant Sandy Pebble Stratum
(China Railway Chengdu Rail Transit Co., Ltd., Chengdu 611731)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn