现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2012, Vol. 49(2): 21-27    DOI:
Shield Construction Risks and Quality Control Measures for Lot 2222 of the Shenzhen Metro Line 2
(1 Shenzhen Municipal Engineering Corp., Shenzhen 518000;
2 Shenzhen Water Resources Planning & Design Institute, Shenzhen 518000)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn