|
2012, Vol. 49(2): 21-27 DOI: | ||
Shield Construction Risks and Quality Control Measures for Lot 2222 of the Shenzhen Metro Line 2 | ||
(1 Shenzhen Municipal Engineering Corp., Shenzhen 518000; 2 Shenzhen Water Resources Planning & Design Institute, Shenzhen 518000) |
||
Received null Revised null | ||
Supporting info | ||
|