|
2012, Vol. 49(2): 59-64 DOI: | ||
Study of Key Techniques for a Shield Machine Passing Through a Mined Tunnel | ||
(1 Shenzhen Municipal Engineering Corporation, Shenzhen 518000; 2 Shenzhen Water Resources Planning & Design Institute, Shenzhen 518000) |
||
Received null Revised null | ||
Supporting info | ||
|